Make false positive rate (FPR) design matrix for dates with R format.
s_date_FPR
creates design matrices for FPR regressions;
s_date_FPR(Rdate, Y, basis = "ps", dof = 10, ...)
Rdate
: a vector of dates of R format
Y
: Binary case/control status; 1 for case; 0 for controls
basis
: "ps" for penalized-splines based on B-spline basis functions
dof
: Degree-of-freedom for the bases.For "ps" basis, the number of columns is dof
if intercept=TRUE
; dof-1
if FALSE
.
...
: Other arguments as in splines::bs()
Design matrix for FPR regression, with cases' rows on top of controls'.
data(data_nplcm_reg_nest) s_date_FPR(data_nplcm_reg_nest$X$DATE,data_nplcm_reg_nest$Y,basis='ps',dof=7)
nplcm()
Useful links